Today's Inspections

 
PERMITADDRESSINSPECTIONINSPECTORTIME RANGERESULTCOMPLETED
285 CURREY LNFINAL BUILDING**Kenneth HenryAMPASSED04/01/2026AM
285 CURREY LNFINAL SEWERKenneth HenryAMPASSED04/01/2026AM
285 CURREY LNFINAL SEWERKenneth HenryAMPASSED04/01/2026AM
285 CURREY LNFINAL BUILDING**Kenneth HenryAMPASSED04/01/2026AM
285 CURREY LNFINAL SEWERKenneth HenryAMPASSED04/01/2026AM
285 CURREY LNFINAL BUILDING**Kenneth HenryAMPASSED04/01/2026AM
285 CURREY LNFINAL SEWERKenneth HenryAMPASSED04/01/2026AM
285 CURREY LNFINAL BUILDING**Kenneth HenryAMPASSED04/01/2026AM
285 CURREY LNFINAL SEWERKenneth HenryAMPASSED04/01/2026AM
285 CURREY LNFINAL BUILDING**Kenneth HenryAMPASSED04/01/2026AM
285 CURREY LNFINAL SEWERKenneth HenryAMPASSED04/01/2026AM
285 CURREY LNFINAL BUILDING**Kenneth HenryAMPASSED04/01/2026AM
388 AND 390 SAUSALITO BLVDFLOOR FRAMEKenneth HenryAM  AM
388 AND 390 SAUSALITO BLVDROUGH FRAMINGKenneth HenryAM  AM
160 SAN CARLOS AVEFINAL BUILDING**Kenneth HenryAM  AM
303 BRIDGEWAY BLVDROOFKenneth HenryTBD   
75 MONTE MAR DRWALL BOARDKenneth HenryPM  PM
10 WRAY AVEFINAL BUILDING**Kenneth HenryPM  PM
838 OLIMA STINSULATIONKenneth HenryAM  AM
34 MARIE STFINAL BUILDING**Kenneth HenryAMPASSED04/01/2026AM
20 CRECIENTA DRFINAL BUILDING**Kenneth HenryPM  PM
87 LINCOLN DRWEATHERPROOFINGKenneth HenryAM  AM
87 LINCOLN DRSHEATHINGKenneth HenryPM  PM
4, 6A, 6B WEST COURTFINAL BUILDING**Kenneth HenryAMRESCHEDULED04/01/2026AM
802 SPRING STSET ELECTRIC METERKenneth HenryAM  AM
109 WEST ST UNIT 1FINAL ELECTRICAL**Kenneth HenryPM  PM
109 WEST ST UNIT 2FINAL ELECTRICAL**Kenneth HenryPM  PM
109 WEST ST UNIT 3FINAL ELECTRICAL**Kenneth HenryPM  PM
109 WEST ST EXT LNDRYFINAL ELECTRICAL**Kenneth HenryPM  PM
 

INSPECTION LIST The list above reflects all inspections that are scheduled for the current day. The list shown reflects the inspections in numerical order, but does not indicate a specific time frame for your inspection. If your inspection is shown above, it was scheduled for the time frame that was requested. Please remember the time preference requested is a window between either 9:00am-12:00pm or 1:00pm-4:00pm. If your inspection needs to be rescheduled to another time and/or day, the Building Department staff will contact you. If you believe you scheduled an inspection for the current day, but do not see it above, please contact the Building Department at (415)289-4128.


GUIDELINES FOR INSPECTIONS Building inspections can be scheduled by calling (415)289-4100 ext.811. Please leave the day and date of the inspection, the permit number, site address, time preference (AM or PM), the type of inspection, a contact name and phone number in your request. If the above information is not provided, the inspection request may be deferred or asked to be rescheduled with all information. Inspections must be requested by 7:30am the day of the inspection. If the request is received after 7:30am, it will automatically be rescheduled for the next inspection day. A responsible party shall be on-site during the inspection, unless otherwise indicated to the Building Department staff prior to the inspection. No confirmation will be received once an Inspection is scheduled. Sewer Lateral Inspections must be scheduled with the Sewer Coordinator by email 72 hours in advance. For any other information regarding inspections, please contact the Building Department at (415)289-4128.  


Encroachment Permit Inspections: Either request through eTrakit or email adavidson@sausalito.gov, sbukhari@sausalito.gov & mlockett@sausalito.gov a minimum of 72 hours in advance.